Duration of Project
Existing internal wall removed.
Boiler relocated from the kitchen to the garage.
New electrics installed to suit the proposed new layout and the Client’s needs.
Kitchen ceilings and walls plastered.
New bespoke kitchen installed.
Bespoke quartz worktops installed together with mirrored splashback tiles.
New Oakwood oak flooring installed.
Full decoration of the kitchen and surrounding area completed throughout.